Mindemoya River Sites 662 & 664

PROJECT:  Mindemoya River Sites 662 & 664

CLIENT:  Manitoulin Streams

NUMBER OF YEARS DEALING WITH CLIENT: +/- 10 years

DESCRIPTION OF PROJECT:

  • Water’s Edge was authorized to design and supervise the implementation of bank erosion protection, debris removal, riparian buffer and enhance in-stream fish habitats on Mindemoya River at Site MIN 662 & 664.
  • Water’s Edge conducted a pre, during and post construction investigation of the site.
  • The approved plans consisted of a regrading of the bank, the placement of vegetated stone bank toe protection, placement of root wads, floodplain plantings and rock piles were added to the stream bed to provide habitat.
  • Regular inspections by Water’s Edge staff and Manitoulin Streams staff ensured that appropriate erosion and sediment controls were implemented during construction.
  • Water’s Edge recommended spring and fall monitoring inspections of the site for the next few years to ensure that the site works are stable and functioning as designed.

SERVICES PROVIDED:

  • Surveying,
  • Fluvial geomorphic assessments,
  • Natural Channel Design,
  • Tendering input,
  • Construction Inspection,

DATE OF PROJECT:  Fall 2017