City of Toronto Stormwater Outfalls

PROJECT:  City of Toronto Stormwater Outfalls

CLIENT:  City of Toronto

DESCRIPTION OF PROJECT: 

  • Water’s Edge was contracted by City of Toronto to complete a condition assessment and prioritization on ten (10) City outfalls.
  • Subsequently, Water’s Edge undertook the design for the top two outfalls that needed replacement.
  • Each outfall required the team to complete a Preliminary Design and Detailed Design, as well as provide construction site support and post- construction monitoring and reports.
  • Outfall one required slope stabilization, a new maintenance chamber, new outfall, a retaining wall, and channel alterations.
  • Each design required coordination with multiple regulatory agencies and sub-consultants.
  • Monitoring of site is ongoing.

SERVICES PROVIDED: 

  • Project Management
  • Field surveys
  • Inventory, Analysis, and Prioritization
  • Preliminary Design, Detailed Design
  • Construction Supervision
  • Post – Construction Monitoring Reports

DATE OF PROJECT:  Fall 2018 – ongoing. 

Site 1 Pre-Construction (2018)

Site 1 Post-Construction (2023)