Rouge Hills Drive Outfall Restoration
Water’s Edge was authorized by the City of Toronto to undertake an assessment and repair design of a severely degraded storm outfall in Scarborough.
Rouge Hills Drive Outfall Restoration Read More »
Water’s Edge was authorized by the City of Toronto to undertake an assessment and repair design of a severely degraded storm outfall in Scarborough.
Rouge Hills Drive Outfall Restoration Read More »
Water’s Edge was authorized to design and supervise the implementation of bank erosion protection, debris removal, riparian buffer and enhance in-stream fish habitats on Mindemoya River at Site MIN 662 & 664.
Mindemoya River Sites 662 & 664 Read More »
A sanitary sewer siphon within Humber Creek became exposed due to the severe degradation of soft shales in the watercourse.
Chapman Valley (Humber Creek) – Phase 1 Read More »
Commercial development project in the City of Markham required the realignment for 225 metres of creek including a new road crossing.
East Carlton Creek Channel Realignment – Commercial Development in Markham Read More »
Water’s Edge, in conjunction with Cambridge Landscaping and Construction Ltd., was engaged by the City of Oshawa to complete a Design-Build of Farewell Creek.
Farewell Creek Design – Build Read More »
This project was building on previous work with Conservation Halton in Partnership with the City of Hamilton to restore Mountsberg Creek
Mountsberg Creek Restoration Project Read More »
Water’s Edge was engaged by Lake Simcoe Region CA to prepare an assessment and channel design of a severely impacted reach of Kidds Creek in the City of Barrie.
Upper Kidd’s Creek Hydro-Geomorphic Assessment and Designs Read More »
Water’s Edge was authorized by Hamilton Conservation Area (HCA) to complete an assessment of three Spencer Creek tributaries containing seven manmade (or anthropogenic) online ponds with the intention of removing the ponds.
Christie Lake Conservation Area – Pond Decommissioning and Fish Habitat Improvement Read More »